• zoom sur le bâtiment intégré dans le site
  • vue générale du site
  • Vue depuis la route du dessus
  • Vue depuis la route de dessous

CPI CERD

Maître d’ouvrage :
Conseil Gal de Haute-Savoie
2007-2010
1890m² S.H.O.N
3 946 800 € T.T.C
Full services

The project brought together in the same place two different entitées:
-secondary road department
-fire station
The architectural concept is based on a layered organization interconnected by a column vertical spine that facilitates internal laisons and decreases the maximum displacement. The architectural style is rooted in the original Flaine with the use of concrete and plaster recalling the natural raw aspects of the buildings of the time.